Log In   View a printable version of the current page.
0 - Precursor - Exchange Electrical Model - Space (ER)
Added by Jeffrey Wix, last edited by Jeffrey Wix on Feb 10, 2007  (view change)
Labels: 
(None)


Precursor

For information, refer to: er_exchange_building_model(sketch)

The provisions of the exchange requirement [Exchange Building Model - Sketch]must be satisfied. This includes all context information provided through project details including:
  • the name of the project and, optionally, the phase of work of the project
  • the default units used throughout the project
  • the world coordinate system
  • the coordinate space dimension
  • the precision used within the geometric representations
  • true north relative to the world coordinate system
  • different types and scales that can be used for representing stored shapes (symbols) where these have multiple representations (e.g. multi-view blocks)
    \
    Additionally, the building information model provides the following information proposed by the building designer that is required for electrical systems design:
  • spatial structure element s (site, buildings, storeys, spaces)

Powered by Atlassian Confluence, the Enterprise Wiki. (Version: 2.1.3 Build:#408 Jan 23, 2006) - Bug/feature request - Contact Administrators