Precursor
In this section all precursor realted information needed to satisfy the Exchange Energy Analysis Model (Zones) will be described.
| Information Needed | Man | Opt | Rec | Actor Supplying | Functional Part |
|---|---|---|---|---|---|
| The provisions of the exchange requirement [Exchange Project (ER)] must be satisfied. Project stage must be identified. | |
Building Desing, [Cost Modelling] | [Exchange Project (ER)] | ||
The provisions of the exchange requirement er_exchange_building_model (programming) should be satisfied. This provides the following information that is required:
|
|
Building Desing | [Exchange Building Model - Sketch (ER)] | ||
| Technical solutions data concerning electrical systems should be provided where (and when) available. | Electrical Design | [Exchange Electrical Model - Design (ER)] | |||
| Technical solutions data concerning HVAC systems should be provided where (and when) available. | HVAC Design | [Exchange HVAC Model - Design (ER)] | |||
| The updated energy target resulting from the previous stage of energy analysis work. | Energy and Comfort Advisor | [Exchange Energy Analysis Model - Programming (ER)], [Exchange Energy Analysis Model - Design (ER)] |