1 - Site (Generally) - Exchange Cost Model - Order of Magnitude (ER)
Added by Jeffrey Wix, last edited by Jeffrey Wix on Apr 10, 2007
Labels: 
(None)


Site (Generally)

In the context of this exchange requirement, a site is the place at which the building will be located.

Several sites may be defined at geographical locations to test the order of magnitude of cost for various building options.

Note that dimensional and shape representation information about the site need not be given at this stage.

Site information required to establish 'order of magnitude' cost includes:

Information Needed MAN REC OPT
Specification of site name and description if required    
An extended name for the site may also be specified if required    
Specification of each site as an elemental (single) site.
References to site may be made complex or partial at a later stage but for present purposes need only be elemental.
   
The reference elevation above sea level of the site may be given.
This provides a reference height from which the elevation of elements relative to the site may be determined.
   
The reference latitude of the site may be given.    
The reference longitude of the site may be given.    
The postal address for the site, if available, may be given.    
The land title number of the site may be given.
This is the identification given to the site within the local geographical/planning context.
   