Cost Groups (Quantities)
Note that the contents shown here apply to both the 'Preconstruction Estimate' stage and to the 'Request for Quotation' stage
For each cost group that is identified, the total value of the reference quantity that is to be used for costing within the cost item (see below) needs to be determined:
Information below is provided by the role Cost Modelling through the functional part fp_define_quantity
| Information Needed | MAN | REC | OPT |
|---|---|---|---|
Determine either:
|
|