Exchange Maintenance Plan (ER)
Added by Jeffrey Wix, last edited by Jeffrey Wix on Mar 15, 2007  (view change)
Labels: 
(None)


Exchange Maintenance Plan

Project Stage

Stage Name Valid  
0 Portfolio requirements  
1 Conception of need  
2 Outline feasibility  
3 Substantive feasibility  
4 Outline conceptual design  
5 Full conceptual design  
6 Coordinated design and procurement
7 Production information
8 Construction
9 Operation and maintenance
10 Disposal  

Overview

The scope of this exchange requirement is to support the exchange of information concerning maintenance plans.
A maintenance plan is a type of work plan in which the work tasks that are planned are specifically related the assets that are to be maintained. That is, the maintenance plan will provide a listing of all the maintenance tasks that must be undertaken and the period that can elapse between successive performances of the same task. A maintenance plan does not identify the actual dates on which work should be undertaken. This is the function of a maintenance schedule and this is described elsewhere..
Additionally, a maintenance plan may define required resources to perform tasks in terms of the skills or capabilities required. It is not expected that a maintenance plan will identify actors by name.
For instance, the shaft bearings of a pump impeller may require lubrication once each year with the work being undertaken by a Class 1 Lubrication Specialist. This is a work description that can form the basis of a maintenance plan.
For a maintenance plan, the following information will be needed:

  • The maintenance tasks that are to be undertaken with, for each task:
    • Identity of the task (using the general form of identification or breakdown structure adopted for the project)
    • The name of the task (i.e. how it will be shown in a chart)
    • Any further useful description (which may be provided if required).
    • Indication that this is not a milestone task (note that a task is required to be identified as to whether or not it is a milestone; this is not considered to be appropriate for a maintenance plan and the value should therefore be set to FALSE by default.
  • The assets on which the work is done
  • For each task on a particular asset, the period of time between occasions when the work is carried out.

Information Requirements

Context Description
Precursor Entities that are to be subject to maintenance planning are already defined as assets. This means that the er_exchange_asset exchange requirement provisions will have been satisfied.
Maintenance Plan Provides for the capture of all information that defines the maintenance plan.
Nest Allows tasks to be contained (nested) within other tasks.
Resource Defines resources that may be associated with a task in a work plan.
1 - Maintenance Plan - Exchange Maintenance Plan (ER) (Information Delivery Manual (IDM))
2 - Nest - Exchange Maintenance Plan (ER) (Information Delivery Manual (IDM))